How the calculation works
The current a load draws depends on its real power, the voltage, the circuit type and the power factor (PF):
- Single-phase: amps = kW × 1,000 ÷ (volts × PF)
- Three-phase: amps per phase = kW × 1,000 ÷ (√3 × volts × PF), with the line-to-line voltage and √3 ≈ 1.732
The default is 208 V three-phase at a power factor of 1.0, because racks drawing more than a few kilowatts are often fed with three-phase circuits in North American colocation. Change the voltage and phase to match the circuit you are quoting. For IT equipment, 0.9 or 0.95 are common planning values for PF; a lower PF means more current for the same kW.
The calculator also shows the apparent power in kVA (kW ÷ PF) and the smallest circuit rating that keeps the load at or below 80% of the breaker (amps ÷ 0.8). That 80% figure reflects the North American practice for continuous loads; it is planning context, not electrical advice, and other countries’ rules differ.
Line-to-line on a three-pole breaker. A three-phase rack circuit from a 208Y/120 V panel uses a three-pole breaker with three hot conductors. The voltage between any two of them is 208 V (line-to-line); between any one and neutral it is 120 V (208 ÷ √3, line-to-neutral). Enter 208 V. The answer is the current in each of the three conductors, which is the number to compare with the breaker’s rating.
Worked example
A colocation cabinet is planned for 10 kW of servers with a power factor of 0.95, on a 208 V three-phase circuit:
- amps per phase = 10,000 ÷ (1.732 × 208 × 0.95) = 10,000 ÷ 342.3 = 29.22 A
- apparent power = 10 ÷ 0.95 = 10.53 kVA
- at 80% loading, the circuit needs a rating of at least 29.22 ÷ 0.8 = 36.52 A, so a 30 A three-phase circuit is too small and a 40 A one fits
The same cabinet in a facility that distributes 415 V three-phase (415Y/240 V):
- amps per phase = 10,000 ÷ (1.732 × 415 × 0.95) = 14.64 A
- applying the same 80% planning margin gives at least 18.31 A, so a 16 A three-phase circuit is too small and a 32 A one fits